Staircases & Balcony Restoration
This was a 100% mobile custom job we completed in the summer of 2014. In this residential multiplex in Verdun, the outdoor metal balconies, decks and secondary exit were in poor condition. The steel was heavily corroded. It was becoming a safety hazard for the residents. Our team started by removing the existing railings, soffits and decks. We then proceeded to removing the balcony structure. Using raw steel, we fabricated the structure onsite and installed it the same day. We later installed the new fiberglass decking, which we provided in one piece, and then added the railings. We applied an anti-rust primer coating as a finishing touch. Since we completed this outdoor restoration, the apartment building is much safer and looks nicer. This has a direct impact on real estate value.